Report date: Jan 27,2026 Conflict count: 370687 Publisher: Universitas Asahan Title count: 3 Conflict count: 7 ========================================================== Created: 2025-09-27 03:42:21 ConfID: 8324716 CauseID: 1713942096 OtherID: 1708233226 JT: Jurnal Bidang Aplikasi Teknik Sipil dan Sains (BATAS) MD: Sabda wahyuna,4,2,28,2025,ANALISA POROSITAS BETON BERPORI BERBASIS ZEOLIT ALAM PAHAE DAN KARBON AKTIF KULIT COKLAT DOI: 10.36294/batas.v4i2.4965(Journal) (8324716-N) DOI: 10.36294/bfdhsw14(Journal) ========================================================== Created: 2025-09-27 03:34:01 ConfID: 8324696 CauseID: 1713941558 OtherID: 1708234660 JT: Jurnal Bidang Aplikasi Teknik Sipil dan Sains (BATAS) MD: Misdi,4,2,47,2025,STUDI KOMPARATIF ANALISIS SEISMIK PADA STRUKTUR DASAR TETAP DAN DASAR TERISOLASI DOI: 10.36294/batas.v4i2.4954(Journal) (8324696-N) DOI: 10.36294/4cbcx331(Journal) ========================================================== Created: 2025-09-27 03:33:53 ConfID: 8324677 CauseID: 1713941735 OtherID: 1708234617 JT: Jurnal Bidang Aplikasi Teknik Sipil dan Sains (BATAS) MD: Ivan Kristian Wijaya Telaumbanua,4,2,35,2025,ANALISIS PERBANDINGAN PERHITUNGAN DAYA DUKUNG TANAH DARI HASIL UJI SONDIR/CONE PENETRATION TEST (CPT) PADA PROYEK GEDUNG KPPN TANJUNG BALAI DOI: 10.36294/batas.v4i2.4955(Journal) (8324677-N) DOI: 10.36294/h1h2nr46(Journal) ========================================================== Created: 2025-09-27 03:33:20 ConfID: 8324676 CauseID: 1713941733 OtherID: 1708232942 JT: Jurnal Bidang Aplikasi Teknik Sipil dan Sains (BATAS) MD: Siregar,4,2,19,2025,SISTEM INFORMASI GEOGRAFIS PEMETAAN TANGGUL KRITIS PADA SUNGAI BUNUT DI KECAMATAN RAWANG PANCA ARGA DOI: 10.36294/batas.v4i2.4958(Journal) (8324676-N) DOI: 10.36294/k4va5s05(Journal) ========================================================== Created: 2025-09-27 03:32:58 ConfID: 8324656 CauseID: 1713941675 OtherID: 1708229959 JT: Jurnal Bidang Aplikasi Teknik Sipil dan Sains (BATAS) MD: Danu Nugraha,4,2,10,2025,METODE PELAKSANAAN, EFISIENSI BIAYA DAN WAKTU PEKERJAAN GALIAN BATU DENGAN METODE PELEDAKAN (BLASTING) PADA PROYEK JALAN TOL SIGLI – BANDA ACEH SEKSI 1A DOI: 10.36294/batas.v4i2.4959(Journal) (8324656-N) DOI: 10.36294/hbhjpd24(Journal)